How To Install the TOUGH GUN Reamer TT Series

WARNING: Ensure the power supply is off and disconnected before proceeding!

Mounting the TOUGH GUN® Reamer

  • The TOUGH GUN Reamer should be installed within the weld cell at a convenient location. Be sure to consider movable fixtures and the working envelope of the robot.
  • Affix the TOUGH GUN Reamer base to a sturdy platform using the four (4) bolts provided.

Mounting Hole Locations and Footprint

How To Install the TOUGH GUN Reamer TT Series, mounting hole locations and footprint

Connecting the Air Supply

WARNING: Push the RESET button before connecting the air line.

  • Use only filtered, lubricated air.
  • IMPORTANT: Requirements – 80 to 100 psi at 16 CFM (5.0 to 7.0 BAR at 450 LPM) at the TOUGH GUN Reamer during operation.
  • Use an air supply line with an inside diameter of 3/8 inches. Connect to a 1/4-inch female NPT inlet located on the side of the TOUGH GUN Reamer. 

Dimensions

How To Install the TOUGH GUN Reamer TT Series, Image 2